Profile Project

Information updated to: 31/08/2016

Project

ASIA – Architetture Strutturali e processi Innovativi dell’Ala

Code PON01_00292
Field/s Transport and Logistics
Description The use of composite materials, with carbon fiber reinforced and thermoset or thermoplastic matrix for civil transport aircraft is continuously increasing. That is due mainly to weight reduction, which gives advantages in terms of fuel consumption, and consequently with minor CO2 production, and a better aircraft performance, with an increase of maximum range and/or payload. The use of composites progressively was extended from secondary to primary structures, with more critical applications. A very qualified example is the new Boeing wide body aircraft 787 Dreamliner, whose fuselage, as well as the wing, are made of composites, as well as the new Airbus A350, presently being developed. In order to increase the advantages obtained through the utilisation of composite materials a cost reduction is needed, to be performer through production processes peculiar of composite materials, namely the ones based on integrated processes and/or the ones starting from separated matrix and reinforcement (infusion). In fact that allows to use cheaper raw materials, without using expensive intermediates (prepreg). A further advantage can be obtained through the use of multifunctional composites, having both structural properties and same other property (e.g. conductivity), with an improvement by the system point of view. This research project is aimed to perform innovative structural solutions to be applied for the wing structure of a regional transport aircraft. The resulting know how increase, finalised to solve specific structural issues, together with the cost reduction issues, will produce a competitivity increase in the regional transport aircraft market for Alenia and its supply chain. The project will investigate innovative structural solutions for the wing of a regional transport aircraft, starting from the material properties with a “scale up” approach through details, subcomponents, up to full scale components. Static and fatigue resistance will be investigated, as well as impact and environmental damage. The project will also study fabrication and assembly processes, which will be validated through full scale representative items. The issues of realization of integral part, and alternative production processes (like infusion) will be considered, as well as multifunctional structure issues. The main goal will be the cost-weight optimisation. The project will involve the complete supply-chain, including material supplier, and research institutes.
Total cost 16,088,938.91 euro
Public contribution
Total public contribution
10,237,103.80 euro

NOP R&C contribution
9,810,187.25 euro

PAC contribution
0.00 euro

Contribution from other funds
426,916.55 euro
Distribution Advancement of distribution in %
Total amount distributed
5,676,532.95 euro

NOP R&C distributed amount
5,539,779.66 euro

PAC distributed amount
0.00 euro

Amount distributed with other funds
136,753.29 euro

Legend

Field/s – Indicates the field or fields in which the project has the most relevance. A project may have more than one field. For some projects it is not assigned. The field are the following 8: "Health and wellbeing", "Food", "Energy", "Environment and Ecology", "Transport and Logistics", "Cultural goods and activities", "Social Innovation" and "Smart Cities".

Description – Descriptive summary of project.

Total cost – Total cost of project.

Public contribution – Three elements are reported:

  • Total commitment – total amount admitted to financing, may include more than contribution to be valued on NOP R&C, also on other funds.
  • NOP R&C admitted contribution
  • PAC admitted contribution
  • Contribution with other funds

Distribution – The following elements are reported:

  • Total distributed amount – takes into account the distributed amount considering both NOP R&C distribution and other funds if provided for
  • NOP R&C distributed amount – amount distributed to financing of project to be valued on NOP R&C
  • PAC distributed amount – amount distributed to financing of project to be valued on PAC
  • Amount distributed with other funds – amount distributed to financing of project with other funds

The distributions refer to the date of last update indicated at top.

Type of beneficiary Public commitment for beneficiary
University 1
Micro business 3
Large business 2
Medium business 2
Total Beneficiaries 8

Seconda Università degli Studi di Napoli

Tax File Number: 02044190615
Unique Project Code: B91C11000140005
Location of financial commitments: Campania
Type: University

Presentation date 09/04/2010
Approval date 22/07/2015
Start of activity Expected date
01/09/2011
Effective date
01/09/2011
End of activity Expected date
31/12/2015
Effective date
-
Total cost 1,525,978.00 euro
Public contribution Total
1,297,081.30 euro
Eligible of NOP R&C
1,297,081.30 euro
Distribution Total
1,297,081.30 euro
Amount of NOP R&C
1,297,081.30 euro

Date of last distribution of NOP R&C
-

Officine Meccaniche Irpine S.r.l.

Tax File Number: 01517970644
Unique Project Code: B91C11000130005
Location of financial commitments: Campania
Type: Micro business

Presentation date 09/04/2010
Approval date 22/07/2015
Start of activity Expected date
01/09/2011
Effective date
01/09/2011
End of activity Expected date
31/12/2015
Effective date
-
Total cost 3,944,223.00 euro
Public contribution Total
2,335,087.45 euro
Eligible of NOP R&C
2,335,087.45 euro
Distribution Total
860,335.25 euro
Amount of NOP R&C
860,335.25 euro

Date of last distribution of NOP R&C
-

ALENIA AERMACCHI S.p.A

Tax File Number: 03902621212
Unique Project Code: B81C11000950005
Location of financial commitments: Campania, Puglia, Sicilia, Extra convergenza
Type: Large business

Presentation date 09/04/2010
Approval date 22/07/2015
Start of activity Expected date
01/09/2011
Effective date
01/09/2011
End of activity Expected date
31/12/2015
Effective date
-
Total cost 6,551,768.00 euro
Public contribution Total
4,012,496.70 euro
Eligible of NOP R&C
3,665,271.90 euro
Distribution Total
2,636,707.78 euro
Amount of NOP R&C
2,565,690.34 euro

Date of last distribution of NOP R&C
-

Tecnosistem S.p.A.

Tax File Number: 01207120633
Unique Project Code: B61C11000490005
Location of financial commitments: Campania
Type: Micro business

Presentation date 09/04/2010
Approval date 22/07/2015
Start of activity Expected date
01/09/2011
Effective date
01/09/2011
End of activity Expected date
31/12/2015
Effective date
-
Total cost 788,850.00 euro
Public contribution Total
512,752.50 euro
Eligible of NOP R&C
512,752.50 euro
Distribution Total
335,036.84 euro
Amount of NOP R&C
335,036.84 euro

Date of last distribution of NOP R&C
-

Sintesi S.p.A

Tax File Number: 11484230153
Unique Project Code: B51C11000270005
Location of financial commitments: Puglia
Type: Medium business

Presentation date 09/04/2010
Approval date 22/07/2015
Start of activity Expected date
01/09/2011
Effective date
01/09/2011
End of activity Expected date
31/12/2015
Effective date
-
Total cost 59,381.91 euro
Public contribution Total
38,598.25 euro
Eligible of NOP R&C
38,598.25 euro
Distribution Total
-
Amount of NOP R&C
-

Date of last distribution of NOP R&C
-

Cytec Industries Italia Srl

Tax File Number: 04639330580
Unique Project Code: B51C11000260005
Location of financial commitments: Campania
Type: Large business

Presentation date 09/04/2010
Approval date 22/07/2015
Start of activity Expected date
01/09/2011
Effective date
01/09/2011
End of activity Expected date
31/12/2015
Effective date
-
Total cost 514,281.00 euro
Public contribution Total
334,282.65 euro
Eligible of NOP R&C
334,282.65 euro
Distribution Total
-
Amount of NOP R&C
-

Date of last distribution of NOP R&C
-

CETMA-Centro di Progettazione, Design & Tecnologie dei Materiali

Tax File Number: 01638210748
Unique Project Code: B21C11000200005
Location of financial commitments: Puglia, Extra convergenza
Type: Medium business

Presentation date 09/04/2010
Approval date 22/07/2015
Start of activity Expected date
01/09/2011
Effective date
01/09/2011
End of activity Expected date
31/12/2015
Effective date
-
Total cost 634,177.00 euro
Public contribution Total
539,050.45 euro
Eligible of NOP R&C
459,358.70 euro
Distribution Total
387,286.94 euro
Amount of NOP R&C
321,551.09 euro

Date of last distribution of NOP R&C
-

LAER S.r.l.

Tax File Number: 05867870635
Unique Project Code: B11C11000150005
Location of financial commitments: Campania
Type: Micro business

Presentation date 09/04/2010
Approval date 22/07/2015
Start of activity Expected date
01/09/2011
Effective date
01/09/2011
End of activity Expected date
31/12/2015
Effective date
-
Total cost 2,070,280.00 euro
Public contribution Total
1,167,754.50 euro
Eligible of NOP R&C
1,167,754.50 euro
Distribution Total
160,084.84 euro
Amount of NOP R&C
160,084.84 euro

Date of last distribution of NOP R&C
-
Axis - Operational objective I - Scientific and technological fields, generators of industry transformation processes and creators of new sectors (Go to )
Action Strategic scientific and technological areas
Action line Industrial Research (Go to)
Instrument of implementation Invitation to presentation of Industrial Research projects (DD 1/Ric 18/01/10)
NSF - objective Strengthen and evaluate the whole chain of research and cooperation networks between the research system and businesses, to contribute to competitiveness and economic growth; sustain maximum distribution and use of new technologies and advanced services; heighten level of scientific and technical knowledge and skills in the production system and in institutions
QR Code for 'http://ponrec.it/en/open-data/projects/profile-project?ProgettoID=5009'
Copyright © 2011 Ponrec