Project

Compositi cementizi eco compatibili realizzati con FIbra di Basalto e con Aggregati di Riciclo (ECOFIBAR)

Code PON01_01522
Field/s Environment and Ecology
Description The ECOFIBAR project goal is to study a new generation of high performance concrete composite, environmental friendly, for using in buildings, made of: • aggregate coming from recycling process or industrial waste • a cheaper and more environmental friendly reinforcement, that ensure high mechanical and chimical resistence Composite also have a concrete matrix whit uniform cromatic property, that can be used without other details. Because we use non convenentional materials, toxicity of the products must be investigated
Total cost 3,938,027.00 euro
Public contribution
Total public contribution
3,114,924.05 euro

NOP R&C contribution
2,603,157.75 euro

PAC contribution
0.00 euro

Contribution from other funds
511,766.30 euro
Distribution Advancement of distribution in %
Total amount distributed
2,273,178.18 euro

NOP R&C distributed amount
2,119,648.29 euro

PAC distributed amount
0.00 euro

Amount distributed with other funds
153,529.89 euro

Legend

Field/s – Indicates the field or fields in which the project has the most relevance. A project may have more than one field. For some projects it is not assigned. The field are the following 8: "Health and wellbeing", "Food", "Energy", "Environment and Ecology", "Transport and Logistics", "Cultural goods and activities", "Social Innovation" and "Smart Cities".

Description – Descriptive summary of project.

Total cost – Total cost of project.

Public contribution – Three elements are reported:

  • Total commitment – total amount admitted to financing, may include more than contribution to be valued on NOP R&C, also on other funds.
  • NOP R&C admitted contribution
  • PAC admitted contribution
  • Contribution with other funds

Distribution – The following elements are reported:

  • Total distributed amount – takes into account the distributed amount considering both NOP R&C distribution and other funds if provided for
  • NOP R&C distributed amount – amount distributed to financing of project to be valued on NOP R&C
  • PAC distributed amount – amount distributed to financing of project to be valued on PAC
  • Amount distributed with other funds – amount distributed to financing of project with other funds

The distributions refer to the date of last update indicated at top.

Type of beneficiary Public commitment for beneficiary
Public research organisation 1
Micro business 1
University 1
Total Beneficiaries 3

ENEA - Agenzia nazionale per le nuove tecnologie, l’energia e lo sviluppo economico sostenibile

Tax File Number: 01320740580
Unique Project Code: I41H11000010005
Location of financial commitments: Non disponibile
Type: Public research organisation

Presentation date 09/04/2010
Approval date 05/06/2012
Start of activity Expected date
01/06/2012
Effective date
01/06/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 1,156,310.00 euro
Public contribution Total
982,863.50 euro
Eligible of NOP R&C
471,097.20 euro
Distribution Total
624,627.09 euro
Amount of NOP R&C
471,097.20 euro

Date of last distribution of NOP R&C
-

Personal Factory s.r.l.

Tax File Number: 03062550797
Unique Project Code: B41C11000740005
Location of financial commitments: Calabria
Type: Micro business

Presentation date 09/04/2010
Approval date 05/06/2012
Start of activity Expected date
01/06/2012
Effective date
01/06/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 2,169,526.00 euro
Public contribution Total
1,611,698.20 euro
Eligible of NOP R&C
1,611,698.20 euro
Distribution Total
1,128,188.74 euro
Amount of NOP R&C
1,128,188.74 euro

Date of last distribution of NOP R&C
-

Università della Calabria

Tax File Number: 80003950781
Unique Project Code: B21H11000410005
Location of financial commitments: Calabria
Type: University

Presentation date 09/04/2010
Approval date 05/06/2012
Start of activity Expected date
01/06/2012
Effective date
01/06/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 612,191.00 euro
Public contribution Total
520,362.35 euro
Eligible of NOP R&C
520,362.35 euro
Distribution Total
520,362.35 euro
Amount of NOP R&C
520,362.35 euro

Date of last distribution of NOP R&C
-
Axis - Operational objective I - Scientific and technological fields, generators of industry transformation processes and creators of new sectors (Go to )
Action Strategic scientific and technological areas
Action line Industrial Research (Go to)
Instrument of implementation Invitation to presentation of Industrial Research projects (DD 1/Ric 18/01/10)
NSF - objective Strengthen and evaluate the whole chain of research and cooperation networks between the research system and businesses, to contribute to competitiveness and economic growth; sustain maximum distribution and use of new technologies and advanced services; heighten level of scientific and technical knowledge and skills in the production system and in institutions
QR Code for 'http://ponrec.it/en/open-data/projects/profile-project/?ProgettoID=5409'
Copyright © 2011 Ponrec