Project

Metodologie innovative di sviluppo di motoptopulsori automobilistici

Code PON01_01517
Field/s Transport and Logistics
Description The proposed Research Program plans to define, develop and validate methodologies and models for calculation, design, control, testing and diagnosis to be used within engine and gearbox development process for automotive application. Powertrain systems currently in production or on development are characterized by a growing complexity, both as increase of functions and number and type of control and regulation parameters. As regards the first aspect an example are devices for electrical end mechanical energy management, diagnostic functions or powertrain management on request of other vehicle electronic systems. As regards the second aspect, new devices are present together with the traditional control parameters (spark advance and throttle): variable valve timing (VVT), variable valve actuation (VVA), turbochargers with growing complexity, etc. These and others new functions require much more time and resources than in the past during the product development and industrialization phases. Furthermore the complexity of the electronic devices for management and diagnosis is growing more and more. On the other hand the automotive market imposes reducing development time, while the needs for cost reduction limits the possibility for an increase of resources. For these reasons it is not possible to rely on traditional processes and methodologies, where: • development and validation of powertrain and its components are mainly based on testing, among all the operating range; • calculation is especially used in order to find the limit operating conditions, for reliability purposes; • control and diagnosis strategies are based on maps designed to control a single actuator using a single sensor signal, computed through long calculation chains and calibrated using trial-and error approach, which normally is not based on the dynamic model of the controlled process, with time and cost consuming test sessions; • on-board diagnostic systems work at subsystem level because they are not designed on a complex model basis, hence they are inadequate because the controlled subsystems interact one another and malfunctions can propagate. For these reasons the new processes and methodologies which are intended to be developed within this Research Program must: • Be able to manage the complexity of the phenomena to be controlled, in terms of different aspects and variability; • Be a standard, i.e. they must be able to be used for several kind of project and product with minor variants, managed by different work groups in different Countries contemporarily; • Designed for a dramatic reduction of the number of tests needed, thanks to a good simulation of reality, through “virtual testing”; • Be used for different purposes; • Control structures shall be: model-based, in order to fully exploit the dynamic links between the acting elements, multi-variables in order to increase the information base used by the control strategies, with re-configuration capability in case of fault; optimized with respect to targets of performance, fuel consumption and emissions; robust with respect to model uncertainly and production variability and disturbances; tolerant to faults and malfunctions; capable of self-configuration in a certain measure.
Total cost 8,595,822.00 euro
Public contribution
Total public contribution
5,622,644.80 euro

NOP R&C contribution
5,548,068.10 euro

PAC contribution
0.00 euro

Contribution from other funds
74,576.70 euro
Distribution Advancement of distribution in %
Total amount distributed
4,716,842.93 euro

NOP R&C distributed amount
4,716,842.93 euro

PAC distributed amount
0.00 euro

Amount distributed with other funds
0.00 euro

Legend

Field/s – Indicates the field or fields in which the project has the most relevance. A project may have more than one field. For some projects it is not assigned. The field are the following 8: "Health and wellbeing", "Food", "Energy", "Environment and Ecology", "Transport and Logistics", "Cultural goods and activities", "Social Innovation" and "Smart Cities".

Description – Descriptive summary of project.

Total cost – Total cost of project.

Public contribution – Three elements are reported:

  • Total commitment – total amount admitted to financing, may include more than contribution to be valued on NOP R&C, also on other funds.
  • NOP R&C admitted contribution
  • PAC admitted contribution
  • Contribution with other funds

Distribution – The following elements are reported:

  • Total distributed amount – takes into account the distributed amount considering both NOP R&C distribution and other funds if provided for
  • NOP R&C distributed amount – amount distributed to financing of project to be valued on NOP R&C
  • PAC distributed amount – amount distributed to financing of project to be valued on PAC
  • Amount distributed with other funds – amount distributed to financing of project with other funds

The distributions refer to the date of last update indicated at top.

Type of beneficiary Public commitment for beneficiary
University 3
Public research organisation 2
Large business 1
Small business 1
Total Beneficiaries 7

UNIVERSITÀ DEGLI STUDI DI NAPOLI FEDERICO II

Tax File Number: 00876220633
Unique Project Code: B61H11000720005
Location of financial commitments: Campania
Type: University

Presentation date 09/04/2010
Approval date 12/05/2014
Start of activity Expected date
01/01/2011
Effective date
01/01/2011
End of activity Expected date
31/12/2014
Effective date
-
Total cost 555,648.00 euro
Public contribution Total
472,300.80 euro
Eligible of NOP R&C
472,300.80 euro
Distribution Total
472,300.80 euro
Amount of NOP R&C
472,300.80 euro

Date of last distribution of NOP R&C
-

CNR - Consiglio nazionale delle ricerche

Tax File Number: 80054330586
Unique Project Code: B61H11000710005
Location of financial commitments: Campania
Type: Public research organisation

Presentation date 09/04/2010
Approval date 12/05/2014
Start of activity Expected date
01/01/2011
Effective date
01/01/2011
End of activity Expected date
31/12/2014
Effective date
-
Total cost 532,286.00 euro
Public contribution Total
452,443.10 euro
Eligible of NOP R&C
452,443.10 euro
Distribution Total
452,443.10 euro
Amount of NOP R&C
452,443.10 euro

Date of last distribution of NOP R&C
-

Consorzio Nazionale Interuniversitario per le Scienze fisiche della Materia

Tax File Number: 97368190589
Unique Project Code: B61H11000700005
Location of financial commitments: Campania
Type: Public research organisation

Presentation date 09/04/2010
Approval date 12/05/2014
Start of activity Expected date
01/01/2011
Effective date
01/01/2011
End of activity Expected date
31/12/2014
Effective date
-
Total cost 313,149.00 euro
Public contribution Total
266,176.65 euro
Eligible of NOP R&C
266,176.65 euro
Distribution Total
266,176.65 euro
Amount of NOP R&C
266,176.65 euro

Date of last distribution of NOP R&C
-

FIAT GROUP AUTOMOBILES SPA

Tax File Number: 07973780013
Unique Project Code: B51H11000470005
Location of financial commitments: Campania
Type: Large business

Presentation date 09/04/2010
Approval date 12/05/2014
Start of activity Expected date
01/01/2011
Effective date
01/01/2011
End of activity Expected date
31/12/2014
Effective date
-
Total cost 5,299,583.00 euro
Public contribution Total
2,915,666.45 euro
Eligible of NOP R&C
2,915,666.45 euro
Distribution Total
2,116,293.43 euro
Amount of NOP R&C
2,116,293.43 euro

Date of last distribution of NOP R&C
-

Università degli Studi del Sannio

Tax File Number: 01114010620
Unique Project Code: B41H11000550005
Location of financial commitments: Campania
Type: University

Presentation date 09/04/2010
Approval date 12/05/2014
Start of activity Expected date
01/01/2011
Effective date
01/01/2011
End of activity Expected date
31/12/2014
Effective date
-
Total cost 455,897.00 euro
Public contribution Total
387,512.45 euro
Eligible of NOP R&C
387,512.45 euro
Distribution Total
387,512.45 euro
Amount of NOP R&C
387,512.45 euro

Date of last distribution of NOP R&C
-

Università della Calabria

Tax File Number: 80003950781
Unique Project Code: B21H11000400005
Location of financial commitments: Calabria
Type: University

Presentation date 09/04/2010
Approval date 12/05/2014
Start of activity Expected date
01/01/2011
Effective date
01/01/2011
End of activity Expected date
31/12/2014
Effective date
-
Total cost 1,202,490.00 euro
Public contribution Total
1,022,116.50 euro
Eligible of NOP R&C
1,022,116.50 euro
Distribution Total
1,022,116.50 euro
Amount of NOP R&C
1,022,116.50 euro

Date of last distribution of NOP R&C
-

Teoresi s.r.l.

Tax File Number: 03037960014
Unique Project Code: B11H11000370005
Location of financial commitments: Campania, Extra convergenza
Type: Small business

Presentation date 09/04/2010
Approval date 12/05/2014
Start of activity Expected date
01/01/2011
Effective date
01/01/2011
End of activity Expected date
31/12/2014
Effective date
-
Total cost 236,769.00 euro
Public contribution Total
106,428.85 euro
Eligible of NOP R&C
31,852.15 euro
Distribution Total
-
Amount of NOP R&C
-

Date of last distribution of NOP R&C
-
Axis - Operational objective I - Scientific and technological fields, generators of industry transformation processes and creators of new sectors (Go to )
Action Strategic scientific and technological areas
Action line Industrial Research (Go to)
Instrument of implementation Invitation to presentation of Industrial Research projects (DD 1/Ric 18/01/10)
NSF - objective Strengthen and evaluate the whole chain of research and cooperation networks between the research system and businesses, to contribute to competitiveness and economic growth; sustain maximum distribution and use of new technologies and advanced services; heighten level of scientific and technical knowledge and skills in the production system and in institutions
QR Code for 'http://ponrec.it/en/open-data/projects/profile-project/?ProgettoID=5407'
Copyright © 2011 Ponrec