Profile Project

Information updated to: 31/08/2016

Project

Sistema di Gestione Integrato per l’Erosione Costiera (SIGIEC)

Code PON01_02651
Field/s Environment and Ecology
Description The project deals with coastal erosion phenomenon. The “contrast “ between human activities and ecosystems equilibrium is a very complex problems along sea coast. This has a lot of implication as many problems and difficulties in social and economic fields arise. This is true especially for Italy but mainly for seasonal tourism regions based. Coastal erosion evolves more speeded than the commercial solution that can solve it and this penalizes tourist activities and people living in. Coasts and their erosion represents a sustainable development level indicator for the actual life. They gives a precise sharp idea on ongoing and future development level. It is necessary both developing an effective “forecast method for beach erosion evolution”, that depends on environmental, natural or human stressing, as prevention action and both an “existing coastal erosion problems solution method” precise actions. Till now the problem was solved as a local solution, “working on emergence – following erosion developing” and generally the effect is move the problem to the next adjacent coastal beach. The product release in this project ill be a Decision Support System. Modern and advanced information technologies, regarding territory analysis and business intelligence will be adopted in order to support decision makers on two main strategic decisional levels: 1. Prevention and support level: in order to allow the plan of infrastructural interventions by P.A. And by private companies. This level is service oriented allowing the suggestion of a valid low environmental impact intervention to attenuate and /or contrast coastal erosion in a well established environmental equilibrium sites. 2. Support and study level: for P.A., this is service oriented to analyze the situation and supports the actions evaluation phase in attenuating and /or contrasting coastal erosion depending on human and natural stressing condition in environmental dis-equilibrium sites Both systems will use numerical simulation advanced codes characterizing real .meteo-marine and physio-graphic local conditions. Their introduction is very important to correctly evaluate the effectiveness of several solutions. Numerical model output will be synthesized in both systems through appropriate typological indicator. Both decisional levels are implemented, in the SSD, by means of two distinct modules (software + data) allowing their composition too. The proposed SSD will be scalable depending on decisional levels availability. Due to the modularity of the system it will be expansible with further databases and analysis objectives. The final product could be used and sold as standalone sub-components. Due to the described characteristics above it is and original and new tool. The application market LLARE) is “seasonal tourism” and it represents a huge amount of the national PIL. In order to have an idea on the economical impact it has we can refer to the Italian wonderful beach and how much this application domain is competitive both for a “natural beach Italian beauty” and both for related tourism services offered. So coastal erosion is a threat to manage and from which protect beaches in an effective way beach adopting low environmental impact solutions. All this is a critical point in order to guarantee a development to the whole and very important Italian economic industry especially for southern regions based on and its consequent social impact.
Total cost 6,243,449.33 euro
Public contribution
Total public contribution
5,157,029.60 euro

NOP R&C contribution
4,933,029.60 euro

PAC contribution
0.00 euro

Contribution from other funds
224,000.00 euro
Distribution Advancement of distribution in %
Total amount distributed
1,573,015.58 euro

NOP R&C distributed amount
1,573,015.58 euro

PAC distributed amount
0.00 euro

Amount distributed with other funds
0.00 euro

Legend

Field/s – Indicates the field or fields in which the project has the most relevance. A project may have more than one field. For some projects it is not assigned. The field are the following 8: "Health and wellbeing", "Food", "Energy", "Environment and Ecology", "Transport and Logistics", "Cultural goods and activities", "Social Innovation" and "Smart Cities".

Description – Descriptive summary of project.

Total cost – Total cost of project.

Public contribution – Three elements are reported:

  • Total commitment – total amount admitted to financing, may include more than contribution to be valued on NOP R&C, also on other funds.
  • NOP R&C admitted contribution
  • PAC admitted contribution
  • Contribution with other funds

Distribution – The following elements are reported:

  • Total distributed amount – takes into account the distributed amount considering both NOP R&C distribution and other funds if provided for
  • NOP R&C distributed amount – amount distributed to financing of project to be valued on NOP R&C
  • PAC distributed amount – amount distributed to financing of project to be valued on PAC
  • Amount distributed with other funds – amount distributed to financing of project with other funds

The distributions refer to the date of last update indicated at top.

Type of beneficiary Public commitment for beneficiary
University 1
Small business 3
Public research organisation 1
Total Beneficiaries 5

Università della Calabria

Tax File Number: 80003950781
Unique Project Code: B91C11000540005
Location of financial commitments: Non disponibile
Type: University

Presentation date 09/04/2010
Approval date 18/01/2016
Start of activity Expected date
21/05/2012
Effective date
21/05/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 2,148,322.51 euro
Public contribution Total
1,826,074.13 euro
Eligible of NOP R&C
1,690,588.13 euro
Distribution Total
611,116.61 euro
Amount of NOP R&C
611,116.61 euro

Date of last distribution of NOP R&C
-

Sistemi Territoriali S.r.l.

Tax File Number: 01187240500
Unique Project Code: B51C11000700005
Location of financial commitments: Calabria, Extra convergenza
Type: Small business

Presentation date 09/04/2010
Approval date 18/01/2016
Start of activity Expected date
21/05/2012
Effective date
21/05/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 1,240,130.72 euro
Public contribution Total
964,111.05 euro
Eligible of NOP R&C
932,111.05 euro
Distribution Total
511,885.52 euro
Amount of NOP R&C
511,885.52 euro

Date of last distribution of NOP R&C
-

MASSA Spin-off S.r.l.

Tax File Number: 05767120487
Unique Project Code: B41C11000530005
Location of financial commitments: Calabria
Type: Small business

Presentation date 09/04/2010
Approval date 18/01/2016
Start of activity Expected date
21/05/2012
Effective date
21/05/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 857,250.00 euro
Public contribution Total
679,485.08 euro
Eligible of NOP R&C
679,485.08 euro
Distribution Total
164,351.28 euro
Amount of NOP R&C
164,351.28 euro

Date of last distribution of NOP R&C
-

CRATI s.c.r.l.

Tax File Number: 01720070786
Unique Project Code: B31C11000620005
Location of financial commitments: Calabria, Extra convergenza
Type: Small business

Presentation date 09/04/2010
Approval date 18/01/2016
Start of activity Expected date
21/05/2012
Effective date
21/05/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 179,439.59 euro
Public contribution Total
141,798.80 euro
Eligible of NOP R&C
109,798.80 euro
Distribution Total
22,813.00 euro
Amount of NOP R&C
22,813.00 euro

Date of last distribution of NOP R&C
-

CNR - Consiglio nazionale delle ricerche

Tax File Number: 80054330586
Unique Project Code: B11C11000470005
Location of financial commitments: Non disponibile
Type: Public research organisation

Presentation date 09/04/2010
Approval date 18/01/2016
Start of activity Expected date
21/05/2012
Effective date
21/05/2012
End of activity Expected date
31/12/2015
Effective date
-
Total cost 1,818,306.51 euro
Public contribution Total
1,545,560.54 euro
Eligible of NOP R&C
1,521,046.54 euro
Distribution Total
262,849.17 euro
Amount of NOP R&C
262,849.17 euro

Date of last distribution of NOP R&C
-
Axis - Operational objective I - Scientific and technological fields, generators of industry transformation processes and creators of new sectors (Go to )
Action Strategic scientific and technological areas
Action line Industrial Research (Go to)
Instrument of implementation Invitation to presentation of Industrial Research projects (DD 1/Ric 18/01/10)
NSF - objective Strengthen and evaluate the whole chain of research and cooperation networks between the research system and businesses, to contribute to competitiveness and economic growth; sustain maximum distribution and use of new technologies and advanced services; heighten level of scientific and technical knowledge and skills in the production system and in institutions
QR Code for 'http://ponrec.it/en/open-data/projects/profile-project/?ProgettoID=5234'